Sectors · Hydrogen and carbon capture

OT cyber security for hydrogen and carbon capture

Hydrogen production, carbon capture and CO2 transport and storage projects are being designed and built now. That's the cheapest time to get control system security right. ControlShield helps developers, EPC contractors and equipment suppliers build IEC 62443 security into these projects from FEED to handover, and prepare for the regulators who will inspect them.

Sectors › Hydrogen and carbon capture

Last checked: 24 November 2026.

The OT cyber risks on hydrogen and CCS projects

  • First-of-a-kind plants. New process designs, new control philosophies and tight schedules leave little room to add security late.
  • Packaged equipment. Electrolysers, compressors, capture units and metering skids often arrive as vendor packages with their own control systems and remote support links.
  • Safety systems. Hydrogen and high-pressure CO2 are hazardous. Safety instrumented systems must stay independent of, and protected from, the networks around them.
  • Links to other networks. Hydrogen plants connect to power supplies and gas networks. CCS chains connect emitters, pipelines and offshore storage run by different companies. Each handover point is a security boundary.
  • Reused infrastructure. Some CO2 storage projects reuse offshore oil and gas pipelines and installations, along with control systems that may be decades old.

Which UK rules apply

Rule or framework What it means for you
COMAH Regulations 2015 Hydrogen at 5 tonnes (lower tier) or 50 tonnes (upper tier) brings a site into COMAH. Other substances on site, such as ammonia or methanol, can add up. The Scottish Government's hydrogen planning guidance (February 2026) advises checking this early in design.
HSE OG86 HSE's operational guidance for inspecting control system cyber security at major hazard sites, based on the NCSC CAF objectives. See our CAF 4.0 and OG86 guide.
NIS Regulations 2018 No separate hydrogen or CCS entry today. Check whether your project supports a listed essential service, such as gas or electricity.
Cyber Security and Resilience Bill Powers to add sectors, wider incident reporting and designated critical suppliers. See our CS&R Bill guide.
Energy Act 2023 and NSTA licensing Ofgem economic regulation of CO2 transport and storage. NSTA carbon dioxide storage licences offshore.
EU NIS2 Directive Covers hydrogen production, storage and transmission operators in EU member states. Relevant if you also operate in the EU.
IEC 62443 The standard series to use for security requirements, target security levels and supplier evidence on new plant.

How ControlShield helps

  • Security requirements at FEED. Zones and conduits, target security levels and a cyber security requirements specification, following IEC 62443-3-2 and 3-3. Project lifecycle support
  • Supplier and package vendor evidence. Requirements for packaged equipment suppliers and integrators, and review of what they send back. Our supplier procurement guide explains the approach.
  • Cyber FAT and SAT. Witnessing security tests at the factory and on site, so what's handed over matches what was specified.
  • COMAH and OG86 readiness. Making sure the cyber security management system and evidence HSE expects are in place before inspection. Regulatory assistance
  • Risk assessments. IEC 62443 risk assessments of the plant, its safety systems and its links to other networks. Risk assessments

What carries over from oil and gas

Our hands-on project work is in upstream oil and gas and downstream gas distribution. Hydrogen and CCS projects are built the same way, by the same kinds of EPC contractors, with the same control and safety systems:

  • Process control and safety systems. Distributed control systems, safety instrumented systems and packaged skids are the core of every oil and gas facility.
  • Major hazard thinking. Oil and gas sites are regulated under COMAH and the offshore safety case regime, so cyber security there is treated as part of process safety. HSE takes the same approach at any COMAH site, including hydrogen plants.
  • Offshore storage. CO2 storage in former oil and gas fields uses the offshore infrastructure and skills we know.
  • Gas networks. Hydrogen blending and conversion affect the same pressure control and telemetry systems that gas distribution networks run today.
  • Security built into projects. We write security requirements into the design and check them at factory and site acceptance, before handover.

See also gas distribution and networks.

Frequently asked questions

Are hydrogen projects covered by the NIS Regulations?

Not as a sector of their own. The NIS Regulations 2018 list essential services in electricity, oil, gas, transport, health, drinking water and digital infrastructure, with no separate entry for hydrogen. The Cyber Security and Resilience Bill gives the government powers to add sectors by secondary legislation, so this may change.

Does COMAH apply to my hydrogen project?

It depends on how much hydrogen and other dangerous substances could be on site. Hydrogen's qualifying quantities are 5 tonnes for lower tier and 50 tonnes for upper tier, and other substances are added together using the COMAH aggregation rules. If COMAH applies, HSE will expect control system cyber security to be managed as part of preventing major accidents.

Who regulates carbon capture and storage?

Several bodies, depending on the part of the chain. Under the Energy Act 2023, Ofgem is the economic regulator for CO2 transport and storage networks. The NSTA licenses offshore CO2 storage. HSE regulates health and safety.

When should cyber security start on a hydrogen or CCS project?

At concept or FEED. Security requirements, zones and conduits, and target security levels are cheapest to set before equipment is specified and bought.

Which parts of IEC 62443 matter for package suppliers?

IEC 62443-4-1 covers how products are developed securely, 4-2 sets technical requirements for components, 3-3 sets requirements for systems, and 2-4 covers integrators and service providers. Most projects ask package vendors for evidence against 2-4 and 4-2.

Sources

Other sectors we support

Free OT cyber security appraisal

How the free appraisal works

  1. Complete the checklist

    Download the free readiness checklist and work through the 35 questions with your control systems team.

  2. Talk it through

    Send it to us and we'll arrange a free 30-minute call within 10 working days to go through your answers.

  3. Get your next steps

    Within 5 working days of the call, we'll send you a follow-up email with your priorities and suggested next steps.

The appraisal is a conversation and a follow-up email. It is not a formal assessment, audit or regulatory submission. No access to your systems is needed.

Designing a hydrogen or CCS project?

Free OT cyber security appraisal: complete our readiness checklist, then talk it through with us on a 30-minute call.